

The Tunnel Design & Safety Consultation Group was formed to ensure
effective design, construction and operation within the context of safety.
The group is made up of representatives from the following groups.
One of the remits of the group is to confirm the basic design and
operating procedures in the context of fully integrated systems for traffic
management, signs and signalling, communication, information, plant
monitoring and control.
The Tunnel shall be built and operated in accordance with the European Union
Legislation Directive 2004/54/EC of the European Parliament and of the Council
on Minimum Safety Requirements for the Tunnel in the Trans-European Road Network
as well as BD78/99 Part 9 Section 2 of Volume 2 Highway Structures Design.
The topics discussed and agreed by the Tunnel Design & Safety Consultation Group are the following: